| ADR-S | Myndigheten för samhällsskydd och beredskaps föreskrifter om transport av farligt gods på väg och i terräng |
| AI | Action Items |
| AKB | Allmänkraft och belysning |
| ALCOA | Attributable Legible Contemporaneous Original Accurate |
| AMA | Auxiliary Materials |
| AMC | Auxiliary Materials Chemicals |
| AMF | Auxiliary Materials Filter |
| AML | Arbetsmiljölagen |
| AOF | Animal Origin Free |
| APD | Arbetsplatsdisposition |
| AS/ASB | Analytical Specification / Analytical Specification Basic |
| ASR | Analytical Specification Raw material |
| ATEX | Atmosphères Explosibles - Explosiva atmosfärer |
| AU | Artikelunderlag |
| BAT | Best Available Technology |
| BCP | Business Continuity Plan |
| BCP | Business Continuity Plan |
| BDDE | 1.4-Butanediol diglycidyl ether |
| BOM | Bill of Materials |
| BP | Batchprotokoll |
| BSE | Bovine Spongiform Encephalopathy |
| C&Q | Commissioning and Qualification |
| CAIO | Corporate Action Items Only |
| CAPA | Corrective Action Preventative Action |
| CAPEX | Capital Expenditure - Utgör kostnader som kommer från investeringsköp och som tillfaller avskrivningar |
| CAPM | Capital Asset Pricing Model |
| CAR | Capital Adequacy Ratio |
| CBE | Change Being Effected |
| CBS | Customized Bioprocess Solutions |
| CC | Change Control |
| CCB | Change Control Board |
| CCN | Change Control Notification |
| CDE | Chief Design Expert |
| CDM | Custom Designed Media |
| CDP | Chemical Production Uppsala |
| CE | Conformité Européenne (European Conformity) |
| CIP | Cleaning-In-Place |
| CLP | EU-förodning om klassificering, märkning och förpackning |
| CNC | Controlled Not Classified - Ingen renhetsclassning, men typ rena skor ska användas och/eller rock |
| COL | Component List |
| COM | Commissioning |
| CPP | Critical Process Parameter |
| CPQ | Concurrent Process Qualification |
| CPU | Chemical Production Uppsala |
| CQA | Critical Quality Attributes |
| CQV | Comissioning, Qualification and Validation |
| CR | Comparative Review |
| CV | Cleaning Validation |
| D | Detectability (Upptäckbarhet) |
| Dem Vatten | Deionized Water |
| DF | Distributionsledning Fyllningsmaskin |
| DHF | Design History File |
| DNR | Dy Natural Rubber |
| DOL | Dokumentlista |
| DOR | Daily Operating Review |
| DQ | Designkvalificering - Dokumenterat säkerställande av att utrustningens design uppfyller kravställningen. |
| DR | Design Review |
| DRB | Document Review Board |
| DSAT | Delivery Acceptance Test |
| DSC | Distributed Control System |
| DV | Destillerat Vatten |
| DV20 | Destillerat vatten |
| DV90 | Renat vatten |
| EDMS | Electronic Document Management System |
| EHS | Environment, Health and Safety |
| EI XX | Brandteknisk klassbeteckning för en konstruktions motståndskraft mot brand i avseende av integritet och isoleringsförmåga. XX avser tidsfaktor för denna motståndskraft i minuter |
| EMA | European Medicines Agency |
| ENT | Entrance Module (C8) |
| ER1 | Ethanol Recovery Module 1 (C8) |
| ERT | Emergency Response Team |
| EVA | Economic Value Added |
| F&E | Facilities and Equipment |
| FAT | Factory Acceptance Test - Tester som utförs hos leverantör av utrustningar och system. |
| FBE | Förordning om Brandfarliga och Explosiva varor |
| FDS | Functional Design Specification |
| FMEA | Failure Mode and Effect Analysis, riskbedömning |
| FOF | Face of Flange / Face of Finish |
| FPS | Final/Finished Product Specification |
| FS | Funktionsspecifikation |
| FSP | Functional Specification Process |
| FU | Förebyggande underhåll |
| FV | Filling Validation |
| GA | General Arrangement Drawing |
| GAMP | Guidlines för "Good Automation Manufacturing Practice" |
| GDP | God dokumentationspraxis / Good Documentation Practices |
| GK | Godkänd |
| GMP | God tillverkningssed / Good Manufacturing Practices |
| GQP | Global Quality Procedure |
| HA | Sodium Hyaluronate |
| HA | Hyaluronic acid - hyaluronsyra |
| HAC | Hazardous Area Classification |
| HazOp | Hazard & Operability Analysis |
| HDS | Hardware-specifikation |
| HFAT | Hardware FAT |
| HVAC | Heating, Ventilation and Air Conditioning |
| HWPD | Hardware Product Documentation |
| IARC | Impact Assessment and Risk Classification |
| IBC | Intermediate Bulk Container |
| IDRA | International Drug Regulatory Affairs |
| IFC | Issued For Construction |
| IGK | Interimsgodkänna |
| ILT | Instructor-led Training |
| IPL | Inspection Plan |
| IQ | Installationskvalificering - Verifiera att utrustning eller process är korrekt installerad, stämmer med specifikation, leverantörens rekommendationer och URS |
| ISF | Information Security Framework |
| ISRM | Information Security and Risk Management |
| IT | Integrity Test |
| ITCP | IT Compliance and Projects |
| KCI | Key Compliance Indicator |
| KOL | Komponentlista |
| KPI | Key Performance Indicator |
| KVMJ | Kallvatten mjukgjort |
| KVRÅ | Dricksvatten |
| LAF | Laminar Air Flow |
| LBE | Lagstiftning om brandfarliga och explosiva varor |
| LBE | Lagen om Brandfarliga och Explosiva varor |
| LC | Life Cycle - Octapharma - Nivån på ett projekts komplexitet oc hinsats (A-D) |
| LEL | Lower Explosive Limit |
| LIMS | Laboratory Information Management System |
| LLE | Liquid Liquid Extraction |
| LMS | Learning Management System |
| LN2 | Liquid Nitrogen |
| LOAEL | Lowest Observed Adverse Effect Level |
| LOP | Local Operator Panel |
| LOPA | Layer of Protection Analysis |
| LSO | Lagen om skydd mot olyckor |
| LÅV | Lösningsmedlesåtervinning |
| MACO | Maximum Allowable Carry Over |
| MD | Man Days - hur många dagar en resurs spenderar på något |
| MEFAT | Mechanical Electrical FAT |
| MJ | Method Journal |
| ML-pump | Moderlutspump |
| MMOA | Master Method Of Analysis |
| MOC | Management of Change |
| MOP | Method of Preparation |
| MOP | Method of Preparation |
| MPS | Master Product Specification |
| MSAT | Master Schience & Technology |
| MSBFS | Myndigheten för Samhällsskydd och Beredskaps Föreskrifter |
| MTC | Material Transfer Chamber |
| MV | Mean Value |
| MWS | MyWorkShop |
| N/A | Not Applicable |
| NAT | Nucleic Acid Test |
| NC | Non-conformity |
| NDT | Non-Destructive Testing |
| NOAEL | No Observed Adverse Effect Level |
| Non-Wetted | Material not in contact with product |
| NOR | Normal Operating Range |
| NPV | Net Present Value of cash Flow |
| NRL | Natural Rubber Latex |
| OAB | Octapharma AB, Stockholm |
| OD | Outside Diameter |
| OJT | On the Job Training |
| OPEX | Operational Expenditure - Dagliga utgifter för att driva affären eller företaget som inte tillfaller någon investering eller avskrivningar |
| OQ | Funktionskvalificering - Verifiera att utrustning eller process fungerar som kvarställd genom hela det förväntade processområdet |
| OR | Order Request |
| OSA | Organisatoriska och sociala risker |
| P | Probability |
| P&ID | Piping and Instrumentation Diagram |
| PAS | Prior Approval Supplement |
| PCR | Polymerase Chain Reaction |
| PCURS | Process Control User Requirement Specification |
| PDE | Permitted Daily Exposure |
| PED | Pressure Equipment Directive |
| PEN | Protective Earth and Neutral |
| PEP | Project Execution Plan |
| PFD | Process Flow Diagram |
| PG&C | Product Governance and Compliance |
| PIL | Pipe List |
| PLC | Programmable Logic Controller |
| PLM | Project Lifecycle Management |
| PMF | Plasma Master File |
| PMO | Project Management Office |
| POL | Policy |
| PoU | Point of Use |
| PPQ | Process Performance Qualification |
| PPQMP | Process Performance Qualification Master Plan |
| PQ | Performance Qualification |
| PQP | Projekt- och kvalitetsplan |
| PQR | Product Quality Review |
| PR | Parent Record |
| PR | Purchase Request |
| PS | Projektspecifikation |
| PSG | Produktstartsgodkännande |
| PSSR | Pre-Start Safety Review |
| PTM | Preliminär Tillverkningsmetod |
| PUL | Punchlist |
| PUS | Potentialutjämningsskena |
| PV | Process Validation |
| PVENTK | Processventilationskyla |
| PW | Purified Water |
| QA | Quality Assurance |
| QC | Quality Control |
| QED | Quick Connect Electrical Device |
| QiO | Quality in Operations |
| QMS | Quality Management System |
| QP | Qualified Person |
| QPL | Qualification Plan |
| R | Risktal |
| R&D | Research and Development |
| RA | Riskanalys |
| RA | Regulatory Affairs |
| RABS | Restricted Access Barrier System |
| RAT | Rational |
| RB | Rörbrygga |
| REACH | Registration, Evaluation, Authorisation and Restriction of Chemicals Regulation |
| RFQ | Request For Quotation |
| RMS | Raw Material Specification |
| RPN | Risk Priority Number |
| RSD | Relativ Standardavvikelse |
| RSF | Regulatory Support File |
| RSVSPS | Fil med historiska data för en produkt |
| RTM | Requirements Traceability Matrix (Se SPM) |
| RTP | Rapid Transfer Port |
| S | Severity (Konsekvens) |
| SAT | Site Acceptance Test - Tester som utförs efter leverans och installation av utrustningar och system. SAT utförs innan start av kvalificering. |
| SBM | Se SPM |
| SCADA | Supervisory Control and Data Acquisition |
| SCB | System Change Board |
| SCCB | Supplier Change Control Board |
| SEK 426 | Svensk elstandard för klassning av explosionsfarliga områden |
| SFAT | Software FAT |
| SI | Systemidentifikation |
| SIP | Sterilize in Place |
| SLD | Single Line Diagram |
| SLT | Signal-loop-test (kontrollerar att signaler kommer fram, utförs innan automationstester |
| SME | Subject Matter Expert (ämnesområdesexpert) |
| SMP | Site Master Plan |
| SPD | Styrande projektdokumentation |
| SPM | Spårbarhetsmatris |
| SQE | Supplier Quality Engineer |
| SRA | Safety Risk Assessment |
| SRVFS | Statens räddningsverks Föreskrifter (föregångare till MSB) |
| SSAT | Software SAT |
| SSD | Summer Shut Down |
| SV | Sterilization Validation |
| SÄIFS | Sprängämnesinspektionen Föreskrifter (föregångare till MSB) |
| TC | Tri-Clamp - röranslutning |
| TF | Tekniska Försök |
| TFI | (=WFE) Tunnfilmsindunstare |
| TG | Toll Gate |
| TM | Tillverkningsmetod |
| TM/BP | Tillverkningsmetod / Batchprotokoll |
| TOP | Turn-Over-Package (Dokumentleverans till kund) |
| TP | Tidplan |
| TSE | Transmissible Spongiform Encephalopathies including BSE (Bovine Spongiform Encephalopathy |
| TSP | Teknisk Specifikation |
| TW | TrackWise |
| UCL | Upper Control Limit |
| UDAF | Uni-Directional Air Flow |
| UDF | Unidirectional air flow |
| UEG | Undre ExplosionsGräns |
| UEL | Upper Explosion Limit. Högsta koncentrationen av gas eller ånga i luft under vilken antändning kan ske. |
| UGL | Undre guidlinegräns |
| UK | Underkänd |
| UN | Underlag |
| URS | User Requirement Specification |
| USG | Undre specifikationsgräns |
| USP | Unique Selling Point |
| VFD | Variable Frequency Drive |
| VG | Validation Guide |
| VHP | Vaporized Hydrogen Peroxide |
| VMP | Validation Master Plan |
| VOC | Volatile Organic Compound |
| VSP | Validation Summary Plan |
| VSR | Validation Summary Report |
| W | Weld - röranslutning |
| WE | Working Environment |
| Wetted | Material in contact with product |
| WFE | Wiped Film Evaporator |
| WFI | Water for Injection |
| WPQR | Welding Procedure Qualification Record |
| WPS | Welding Procedure Specification |
| WSV | Water System Validation |
| WT | Wall Thickness |
| ÖGL | Övre guidlinegräns |
| ÖSG | Övre specifikationsgräns |